ESD01 track sleeper changer
Applicable field
It is widely used in railway maintenance and emergency repair, and can efficiently replace and install track sleepers.
Product Features
● Sturdy structure, wear-resistant and durable;
● It integrates a ballast removal shovel, a 360° rotating fixture, and precise operation, achieving full-process mechanization from "ballast removal - old pillow removal - new pillow laying - backfilling and leveling", with an efficiency increase of 20 times.
● The hydraulic closed-loop control technology ensures a constant clamping force, guaranteeing zero risk in heavy-duty operations.
Model | Work width(mm) | weight(kg) | Pressure(MPa) | Working flow(L/min) |
8-10T | 2800 | 1000 | 15-18 | 40-50 |
13-15T | 2800 | 1400 | 20-25 | 100-120 |